Trinetri logo
Device Control

Power Management

Power Management enables administrators to centrally configure and manage power settings on Windows endpoints.

  • 1 min
  • September 4, 2026

What You'll Learn

  • How to create a Power Plan, including its name and configuration level (Computer or User)
  • How to configure a power scheme action — creating a new plan, setting it active, and enabling hibernate support
  • How to set idle-timeout behavior separately for "Plugged in" and "Running on battery," covering display dimming, display off, sleep, and system hibernate
  • How to configure additional settings like Power Button Action and Lid Close Action
  • How to deploy a power plan to specific endpoints using a Power Plan Deployment
  • Where to review deployment progress and drill into per-endpoint task status and execution output
CTA background

Experience Trinetri Autonomous Platform in Action.

Frequently Asked Questions

What's the difference between Computer and User configuration level? Configuration Level determines the scope the power plan settings are written to on the endpoint — Computer-level settings apply system-wide, while User-level settings apply to the logged-in user's profile.
What does an Action Type of Create, Modify, or Delete do? Create builds a new power scheme on the endpoint. Modify updates an existing scheme's settings. Delete removes a power scheme, as seen in plans like "Delete Office Power Plan."
What do "Overwrite If Exists," "Set As Active," and "Enable Hibernate Support" control? Overwrite If Exists lets a new scheme replace an existing one with the same name. Set As Active makes the created scheme the endpoint's active power plan. Enable Hibernate Support turns on hibernation for that scheme and unlocks the System Hibernate timeout fields.
What idle actions can a power plan control? Each plan sets separate timeouts for Plugged In and Running on Battery across four actions: Dim the Display, Turn Off the Display, Turn Off to Sleep, and System Hibernate, plus Additional Settings for what the Power Button and Lid Close should do (Do Nothing, Sleep, Hibernate, or Shutdown).
How do I push a power plan to endpoints? Creating a plan doesn't deploy it by itself. Under Power Plan Deployments, create a deployment, choose a scope (e.g. specific endpoints), select the endpoints, choose the power management configuration to apply, and pick a deployment policy that controls the rollout.
Where can I check whether a deployment succeeded? The Power Plan Deployments list shows each deployment's stage and progress. Opening a deployment shows per-endpoint task status (e.g. Success), and opening a task's output shows a timestamped execution log detailing each step — creating the plan, enabling hibernate support, applying settings, and setting it active.